logo

Alma Sports Hall / Benjamín Murúa Arquitectos

Sector: Education

Source: ArchDaily

Project
Closed

Both strategies resulted in a concave shape, generating a continuous space with a high degree of comfort, as it has a clearly differentiated cool underground level from the roof.Located in the Atacama Desert at an altitude of 2,900 meters above sea level, the project is subjected to extreme environmental conditions: high radiation, winds, dust or snow storms, heat, and cold, so the building had to

Project Information FAQ

Project Information

3 Q
The project “Alma Sports Hall / Benjamín Murúa Arquitectos” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Both strategies resulted in a concave shape, generating a continuous space with a high degree of comfort, as it has a clearly differentiated cool underground level from the roof.Located in the Atacama Desert at an altitude of 2,900 meters above sea level, the project is subjected to extreme environmental conditions: high radiation, winds, dust or snow storms, heat, and cold, so the building had to adapt and be designed based on the impacts that these factors could cause in the form.Text description provided by the architects.The design is a response to the environmental constraints encountered during the project development.The second strategy consisted of burying the main level of the program, locating the court on an underground level, and taking advantage of the geothermal energy of the place.Next, two strategies were considered, separated by layers. The first one was to think of an aerial structure with a lower curvature that would better adapt to the wind.First, the weight of the snow and the impact of the wind on the structure were considered, which could require over-structuring in order to prevent deformations.Subsequently, the curvature of the roof was reduced, making it more aerodynamic and achieving a larger thermal comfort zone in the lower level, requiring even further burying of the usable space.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data