Almaty LRT

Sector: Mass Transit • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

Translated version of this PSD: Russian The EBRD is considering a loan of up to EUR 170 million to finance a light rail transit project in the city of Almaty under a sovereign guarantee or under PPP arrangements. The loan will be either to Almaty Elecrotrans, a municipal tram, trolleybus and bus company (or other municipal company) under a sovereign guarantee or to a private operator, if structure

Project Information FAQ

Project Information

3 Q
The project “Almaty LRT” is an infrastructure initiative in the Mass Transit sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Russian The EBRD is considering a loan of up to EUR 170 million to finance a light rail transit project in the city of Almaty under a sovereign guarantee or under PPP arrangements. The loan will be either to Almaty Elecrotrans, a municipal tram, trolleybus and bus company (or other municipal company) under a sovereign guarantee or to a private operator, if structured as a PPP project. The project is expected to be co-financed with other financing institutions to be determined. The proposed loan would finance the construction of the LRT system’s fixed infrastructure and the purchase of urban rail rolling stock. The Project is part of the Integrated Approach to the urban transport sector in Almaty. Under the Integrated Approach the EBRD is supporting introduction of incentive-based service contracts. The Public Service Contract for LRT will: (a) establish standards and a transparent structure for the provision of public transport services; and (b) allow the Company to agree with the City on investment plan and financing. The LRT Project will also facilitate further private sector involvement in the provision of public transportation services in Almaty. It will be achieved by outsourcing of LRT operations to private sector for the first years of operation. Almaty Electrotrans, an integrated public transport operator of trams, trolleybuses and urban buses, or other municipal company owned by the City of Almaty or a private operator. A sovereign guaranteed loan of up to EUR 170 million. Up to EUR 340 million. Categorised B in accordance with the EBRD's 2008 Environmental and Social Policy. The project is expected to further improve environmental situation in the City of Almaty and result in reduced congestion, improved efficiency and quality of urban transport services. A preliminary ESIA was prepared in 2009-2010 by the external consultants for this project and a number of stakeholder meetings were held. The assessment indicated that the project is unlikely to have significant adverse environmental or social impacts, and the potential adverse environmental and social issues are site-specific and can be readily identified and addressed through adequate mitigation measures. Further environmental and social due diligence is underway to review the environmental and social work carried out to date and address any remaining gaps, including a corporate review of the Concessionaire's corporate E&S management systems and capacity to carry out the Project in compliance EBRD Performance Requirements. The due diligence will also ascertain the findings of the preliminary assessment of the potential future environmental and social issues, impacts and benefits associated with the proposed priority investment programme. The necessary mitigation measures and stakeholder engagement will need to be properly implemented by the future Concessionaire during the design, construction and operation phase of the LRT project. A robust Environmental and Social Action Plan (ESAP) and a Stakeholder Engagement Plan (SEP) will need to be prepared for this purpose. This PSD will be updated when the results of due diligence are known. PPP advisory consultants (up to EUR 1.5 million)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data