Alpine Building
One of 3,761 projects Taiyo tracks in Austria.
Source: Keep.EU
With the 2020 targets, the EU has set itself the ambitious task to make the way for a carbon-neutral future. The EU energy efficiency directives for the building sector (2002/91 / EC, 2010/31 / EU, 27/2012 / EU) were implemented in South Tyrol by the BLR NR. 362/2013 and in Austria by the "OIB Guideline 6". Both regions have adopted ambitious energy strategies (Salzburg2050, KlimaLand Strategy). E
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Government, Education
- Location
- Austria
- Updated
- 22 Jul 2026
- Source
- Keep.EU
ConstructChat
Ask ConstructChat about Alpine Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | With the 2020 targets, the EU has set itself the ambitious task to make the way for a carbon-neutral future. The EU energy efficiency directives for the building sector (2002/91 / EC, 2010/31 / EU, 27/2012 / EU) were implemented in South Tyrol by the BLR NR. 362/2013 and in Austria by the "OIB Guideline 6". Both regions have adopted ambitious energy strategies (Salzburg2050, KlimaLand Strategy). Energy efficiency policies are implemented by complex and costly measures and procedures for the building envelope and by a large number of housing technology. They often fall short of the expected savings rates for energy, CO2 emissions, the ecological footprint and maintenance costs. At the same time, the increasing overall complexity of the system "building" requires detailed knowledge of specialized local SMEs in the construction industry, planners and users of the buildings. The project "Alpines Bauen - Low Tech" aims to find “technology-saving” solutions through analysis, good practices and the use of local expertise that increase energy efficiency throughout the entire life cycle of the building, making it environmentally and economically viable by keeping the high standards for the performance, practicability and comfort. The acquired knowledge will be passed to construction-related local SMEs, stakeholders and the population in order to promote cost-effective, high-quality and greener building in the Alpine area. |
Budget |
Location
Country | Austria |
Source
Source reliability | Medium |
Source | Keep.EU |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Government, Education |
Article published date | 2023-07-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Austria
- Drive-Through COVID-19 Community Testing
- Mellach CombinedCycle Gas Turbine CCGT Plant Austria
- Obervermuntwerk II Pumped Storage Power Plant Vorarlberg
- Break Stuff App
- Boehringer Ingelheim’s Biopharmaceutical Production Facility, Vienna, Austria
- HYPO VORARLBERG MEZZANINE ABS FOR EE & NZEB
- BITMOVIN (EGFF)
- AUSTRIAN ENERGY EFFICIENCY FL
