Alpine Elementary School Gas Line Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
- Excavate and install Approximately 300 feet of new 3" Poly gas service from Meter House to School building mechanical Room. 2. Reconnect to existing lines in meter house and mechanical room. 3. Replace any Asphalt and concrete that needs to be removed for new line. 4. Reseed lawn after backfill and dirt settles.
- Status
- Closed
- Sector
- Commercial, Cement, Road, Chemical (Industrial), Government, Oil and Gas, Manufacturing (Industrial)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Alpine Elementary School Gas Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Excavate and install Approximately 300 feet of new 3" Poly gas service from Meter House to School building mechanical Room. 2. Reconnect to existing lines in meter house and mechanical room. 3. Replace any Asphalt and concrete that needs to be removed for new line. 4. Reseed lawn after backfill and dirt settles. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Road, Chemical (Industrial), Government, Oil and Gas, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
