logo

Alta Mesa Uranium In-Situ Recovery Operation

Sector: Nuclear • Location: Texas, United States

Source: Crux Investor

Project
Under Construction

enCore Energy operates the largest in-situ recovery uranium extraction operation in the United States with two active processing plants in South Texas. The Alta Mesa operation commenced production in Q2 2024 through a 70/30 joint venture with Boss Energy Limited, with a plant capacity of 1.5 million pounds of U3O8 annually plus 500,000 pounds from satellite ion exchange plants, totaling 2 million

Status
Under Construction
Sector
Nuclear, Telecommunications
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Crux Investor

ConstructChat

Ask ConstructChat about Alta Mesa Uranium In-Situ Recovery Operation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Alta Mesa Uranium In-Situ Recovery Operation” is an infrastructure initiative in the Nuclear sector, located in Texas, United States. Taiyo aggregates data on it from Crux Investor.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

enCore Energy operates the largest in-situ recovery uranium extraction operation in the United States with two active processing plants in South Texas. The Alta Mesa operation commenced production in Q2 2024 through a 70/30 joint venture with Boss Energy Limited, with a plant capacity of 1.5 million pounds of U3O8 annually plus 500,000 pounds from satellite ion exchange plants, totaling 2 million pounds design capacity. Production is ramping with systematic wellfield development and a target for full capacity by early 2026.

Original sector

Mining

Location

Country

United States of America (USA)

State

Texas

Source

Source

Crux Investor

URL

More Details

Record type

Project

Sector

Nuclear, Telecommunications

Article published date

2025-11-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project