logo

ALTAMAHA TECHNICAL COLLEGE LANDSCAPE IMPROVEMENTS

Sector: Consumer Products • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Altamaha Technical College Landscape Improvement: Along the north side of US 341 from the entrance of Altamaha Technical College east to the Wal-Mart shopping center in the City of Baxley, Appling County, GA. This project will consist of the construction of new sidewalks, walking trails, a pond, pedestrian light poles, site furnishings and landscaping. Clearing and grubbing is also included. Appro

Project Information FAQ

Project Information

4 Q
The project “ALTAMAHA TECHNICAL COLLEGE LANDSCAPE IMPROVEMENTS” is an infrastructure initiative in the Consumer Products sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Altamaha Technical College Landscape Improvement: Along the north side of US 341 from the entrance of Altamaha Technical College east to the Wal-Mart shopping center in the City of Baxley, Appling County, GA. This project will consist of the construction of new sidewalks, walking trails, a pond, pedestrian light poles, site furnishings and landscaping. Clearing and grubbing is also included. Approximately 1300 LF of sidewalk, 4' wide, will be constructed along the east side of the college entrance and the north side of US 341. Approximately 1350 LF of walking trails, 6' wide, will be constructed to connect the rear of the building to the sidewalks and to connect the parking lot of the building to an existing specimen tree west of the entrance. Additional ROW may be required for this project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data