logo

Alto Maipo

Sector: Water Supply and Storage • Location: Chile

Source: International Finance Corporation (IFC)

Project
Completed

The Project under consideration is the construction and operation of the 531 MW Alto Maipo hydropower plants, with a total estimated cost of approximately US$1.9 billion and an estimated output in excess of 2,100 GWh per year. The Project consists of two separate high-head, run-of-river hydropower facilities located about 50 km southeast of Santiago, the load center of Chile’s power grid. Constr

Project Information FAQ

Project Information

5 Q
The project “Alto Maipo” is an infrastructure initiative in the Water Supply and Storage sector, located in Chile. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project under consideration is the construction and operation of the 531 MW Alto Maipo hydropower plants, with a total estimated cost of approximately US$1.9 billion and an estimated output in excess of 2,100 GWh per year. The Project consists of two separate high-head, run-of-river hydropower facilities located about 50 km southeast of Santiago, the load center of Chile’s power grid. Construction of the Project will take place over an approximately five-year period and will require the excavation of about 67 km of tunnels; approximately 90% of total Project civil works are expected to be underground. The Project will have a relatively short 17 km transmission line of to connect it with existing electricity transmission infrastructure, and will not require the construction of dams or reservoirs, or the resettlement of population.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data