Project
Completed

The Project comprises the construction of two run-of-the-river hydroelectric facilities connected in series with a combined capacity of 531 MW for the purposes of providing baseload electricity to the Chilean Central Inteconnected Grid or SIC. The Project will be developed in the Upper Volcan River, Upper Yeso River and Colorado River, all in the Maipo River Basin and 90% of the Project’s infrastr

Project Information FAQ

Project Information

5 Q
The project “Alto Maipo” is an infrastructure initiative in the Raw Materials sector, located in Chile. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project comprises the construction of two run-of-the-river hydroelectric facilities connected in series with a combined capacity of 531 MW for the purposes of providing baseload electricity to the Chilean Central Inteconnected Grid or SIC. The Project will be developed in the Upper Volcan River, Upper Yeso River and Colorado River, all in the Maipo River Basin and 90% of the Project’s infrastructure will be underground. Underground facilities will include powerhouses, siphons, access tunnels and water conveyance systems, including a total of 67 kilometers (km) of tunnels. The Project does not require the construction of surface water reservoirs. Surface infrastructure will include intakes, delivery canals, forebay structures, a new electrical substation, new bridges, access roads and 17 km of transmission lines. The total permanent surface infrastructure will occupy 85 hectare (ha) (with additional 20 has of temporary facilities) and 61.25 ha for the transmission line. Current land use of areas that will be used by the Project’s above-ground infrastructure includes agriculture, cattle grazing and unimproved areas. The underground facilities traverse two protected areas at several hundreds of meters of depth, (a Nature Sanctuary and a Natural Monument) although no surface works are foreseen in any of these protected areas. During the construction phase, 14 muck deposits, ranging in size from 0.83 ha to 5.61 ha, will be sited throughout the Project area and, generally in close proximity to the tunnel portals. The Maipo, Colorado, Volcán, and Yeso rivers are highly intervened by historic and current activities which include limestone mining, other run-of-river power projects (some dating back to the 1920s), informal extraction of riverbed sediments for construction materials, construction of a water reservoir, used today for drinking water supply and irrigation, and introduction of fish species for recreational purposes. The PHAM project will contribute to the production of renewable energy for the Chilean central grid system, off-setting the use of thermal power sources and the generation of approximately 1.5 million tons of CO2 emissions annually. Due to its proximity to the metropolitan region of Santiago, it will further contribute to the stability of electricity supply of the region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date