logo

Alton Wastewater System Rehabilitation

Sector: Water Supply and Storage • Location: Alton, Missouri, United States of America

Source: Dodge USA

Project
Closed

Contract #1 - Wastewater Treatment Facility Rehabilitation including influent flow measurement and screening, Oxidation Ditch and Clarification equipment replacement, UV Disinfection, and other necessary appurtenances for a fully operational wastewater treatment system. Contract #2 - Collection System Improvements including manhole lining and repairs, gravity sewer main cured-in-place lining and r

Status
Closed
Sector
Water Supply and Storage, Chemical (Industrial), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
Location
Alton, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Alton Wastewater System Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Alton Wastewater System Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Alton, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Contract #1 - Wastewater Treatment Facility Rehabilitation including influent flow measurement and screening, Oxidation Ditch and Clarification equipment replacement, UV Disinfection, and other necessary appurtenances for a fully operational wastewater treatment system. Contract #2 - Collection System Improvements including manhole lining and repairs, gravity sewer main cured-in-place lining and repairs, sewer wye testing and grouting, and other appurtenances for fully operational collection ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Alton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project