Alum Creek Trunk Middle Sanitary Sewer Rehabilitation Ph D
Sector: Water Supply and Storage • Location: Columbus, Ohio, United States of America
Source: Dodge USA
This project will provide design services of the rehabilitation of approximately 14,395 lineal feet of 84 and 90 reinforced concrete pipe that has been determined to be in poor condition through direct CCTV and man entry observations. GOALS: MBE/WBE Contract-specific subcontract goals are required for this contract. In order to receive credit for the participation of a MBE/WBE subcontractor, the c
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Waste Processing and Treatment, Commercial, Government, Cement
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Alum Creek Trunk Middle Sanitary Sewer Rehabilitation Ph D
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will provide design services of the rehabilitation of approximately 14,395 lineal feet of 84 and 90 reinforced concrete pipe that has been determined to be in poor condition through direct CCTV and man entry observations. GOALS: MBE/WBE Contract-specific subcontract goals are required for this contract. In order to receive credit for the participation of a MBE/WBE subcontractor, the consultant must use MBE/WBEs certified by the City of Columbus Office of Diversity and Inclusion a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Waste Processing and Treatment, Commercial, Government, Cement |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
