The Brazilian company Alupar Investimentos (Grupo Alusa) was granted an authorization to build two small hydro power plants located in the state of Goias (municipalities of Santa Helena de Goias, Acreuna and Tuverlandia). The following special purpose companies were established to manage the projects:

  • Agua Limpa Energia S.A. - PCH Antonio Dias (23 MW, fomerly known as PCH Agua Limpa)
  • Verde
Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Hydro, Steel, Cable car, Telecommunications, Government, Manufacturing (Industrial), Automotive
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Alupar Small Hydro Power Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Alupar Small Hydro Power Plants” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Alupar Investimentos (Grupo Alusa) was granted an authorization to build two small hydro power plants located in the state of Goias (municipalities of Santa Helena de Goias, Acreuna and Tuverlandia). The following special purpose companies were established to manage the projects: * Agua Limpa Energia S.A. - PCH Antonio Dias (23 MW, fomerly known as PCH Agua Limpa) * Verde 08 Energia S.A. - PCH Verde 08 (28.5 MW) In October 2012, the company signed 30-year contracts with the regulatory agency ANEEL allowing the company to build and operate the power plants. In December 2013, PCH Antonio Dias took part in a bidding process to establish 30-year power purchase agreements with electricity distribution companies; the company won the contracts by offering the tariff of US$ 46.4/MWh (BRL 138 /MWh). PCH Antoino Dias committed to commence operations in 2018. In August 2013, PCH Verde 08 also won power purchase agreements to sell electricity to distribution companies. The company offered the tariff of US$ 43.7/MWh (BRL 130 /MWh). PCH Verde 08 also committed to commence operations in 2018. Alupar estimated the investment in each power plant as follows: * PCH Antonio Dias - US$ 47.8 million (BRL 142.4 million) * PCH Verde 08 - US$ 68.8 million (BRL 204.8 million) In April 2015, the company issued bonds in the value of US$ 84 million (BRL 250 million) to help finance both power plants and two transmission lines. The funding was set to cover 31.7% of PCH Verde 08 costs and 20% of PCH Antonio Dias costs. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Hydro, Steel, Cable car, Telecommunications, Government, Manufacturing (Industrial), Automotive

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project