Alvin Bush Dam Rock Wall Stabilization SOURCES SOUGHT
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The main feature of work for this stabilization project includes the installation of anchored, reinforced concrete liner walls against the exposed rock face first along the spillway channel and second at the tunnel outlet. The concrete liner walls will be constructed to effectively protect the weak rock face from exposure and weathering and will restrain movement of localized areas of rock thereby
- Status
- Closed
- Sector
- Manufacturing (Industrial), Water Supply and Storage, Cement, Tunnel, Hydro, Commercial
- Location
- Renovo, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Alvin Bush Dam Rock Wall Stabilization SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main feature of work for this stabilization project includes the installation of anchored, reinforced concrete liner walls against the exposed rock face first along the spillway channel and second at the tunnel outlet. The concrete liner walls will be constructed to effectively protect the weak rock face from exposure and weathering and will restrain movement of localized areas of rock thereby maintaining the stability. Rock excavation by line drilling with 3-inch diameter holes at maximu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Renovo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Water Supply and Storage, Cement, Tunnel, Hydro, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
