logo
ProjectClosed

AM INN Office Building / LORENZATELIERS

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

Text description provided by the architects.Instead of a land-intensive expansion of the BORA sites inNiederndorf, LORENZATELIERS convinced our client with compact densification of the already developed areas near the banks of the Inn. This keeps land use low and optimizes operational processes between the two existing buildings. With up to 20m long connecting bridges to the existing AT I/II build

Status
Closed
Sector
Steel, Geothermal, Solar, Residential, Cement, Metal, Commercial
Location
Austria
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about AM INN Office Building / LORENZATELIERS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “AM INN Office Building / LORENZATELIERS” is an infrastructure initiative in the Steel sector, located in Austria. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Text description provided by the architects.Instead of a land-intensive expansion of the BORA sites inNiederndorf, LORENZATELIERS convinced our client with compact densification of the already developed areas near the banks of the Inn. This keeps land use low and optimizes operational processes between the two existing buildings. With up to 20m long connecting bridges to the existing AT I/II buildings, the new AT III building forms a “company campus” with short distances. The lowering of the site level around the new building using two green “cut walls” and the preservation or replanting of the tree-lined along the Innstrasse also embed the building in a park-like environment.As a result, all workplaces are located along the outer facade, which – by the client’s specifications – ensures maximum quality of the workplaces, high flexibility in use, and the fulfillment of the requirements of modern office buildings. Due to the flexibility of the design in reinforced concrete skeleton construction, even the conversion into a residential building is conceivable – provided that it is repurposed into a mixed-use area.On the first floor, employees have a place for informal conversations, telephone calls, reading, or study work. On the second floor, these balconies expand – on the east side and west side to the wetlands of the Inn – to spacious, cantilevered, and covered lounges. The external appearance of the new building is essentially characterized by the liveliness of the all-round railing, which consists of flat steel bars of different materials that are staggered in different heights and twists.Office space is planned for the 5 above-ground floors, which will be available to employees from autumn 2023 and will be flexibly grouped around an internal development and communication zone with communal facilities. Access is via 2 interlocking staircases, which together with the sanitary areas and the elevator form the inner core.The thermal envelope consists of the upper floors of floor-height post and beam construction, with elements that can be opened to access the all-round balconies. In addition to that, sun protection in front of the glass elements will be installed. The underground level that houses storage spaces and technical facilities is served with daylight by an all-around, waterproof window band, which helps to save lighting costs and energy consumption. The roof areas are all covered with photovoltaic elements, and a groundwater heat pump is used for heating and cooling the building.

Location

Country

Austria

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Steel, Geothermal, Solar, Residential, Cement, Metal, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project