Amakhala Wind
Active · South Africa
Source: International Finance Corporation (IFC)
Cennergi (Pty) Ltd (“the Company”), a 50:50 JV Company between Exxaro Resources Ltd (“Exxaro”) and The Tata Power Company (“Tata Power”), wants to develop, build, own and operate the Amakhala Wind Farm Project (“Amakhala”, “the Project”). Amakhala is a 138.6 MW greenfield project between the towns of Bedford and Cookhouse in the Eastern Cape province of South Africa that achieved preferred bidder
- Status
- Prospective
- Sector
- Raw Materials, Power Transmission, Wind, Solar, Hydro, Geothermal, Government, Metal, Power Generation (CCGT)
- Location
- South Africa
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Amakhala Wind
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Cennergi (Pty) Ltd (“the Company”), a 50:50 JV Company between Exxaro Resources Ltd (“Exxaro”) and The Tata Power Company (“Tata Power”), wants to develop, build, own and operate the Amakhala Wind Farm Project (“Amakhala”, “the Project”). Amakhala is a 138.6 MW greenfield project between the towns of Bedford and Cookhouse in the Eastern Cape province of South Africa that achieved preferred bidder status in Round 2 of South Africa’s Renewable Energy IPP procurement program. The Project will be undertaken through a special purpose vehicle (SPV) named “Amakhala Emoyeni RE Project 1 (Pty) Ltd”. The Project output will be sold to Eskom SOC Limited, the integrated power utility in South Africa, under a 20 year Power Purchase Agreement (PPA). |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Budget |
Location
Country | South Africa |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Transmission, Wind, Solar, Hydro, Geothermal, Government, Metal, Power Generation (CCGT) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
