logo

Amandi Energy Power plant

Sector: Natural Gas • Location: Ghana

Source: World Bank Group

Project
Active

The $552 million financing will be used for the development of a 200 MW combined cycle, dual-fuel power project in Aboadze, in the Western Region of Ghana. Amandi Energy Ltd. is the SPV via which Amandi Energy Power plant will be developed. Sponsors of the projects are Endeavour Energy with equity interest of 51 per cent, Amandi Founder Group with 24.5 per cent, and Aldwych International with 2

Status
Prospective
Sector
Natural Gas, Oil and Gas, Power Generation (CCGT), Government, Commercial
Location
Ghana
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Amandi Energy Power plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Amandi Energy Power plant” is an infrastructure initiative in the Natural Gas sector, located in Ghana. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The $552 million financing will be used for the development of a 200 MW combined cycle, dual-fuel power project in Aboadze, in the Western Region of Ghana. Amandi Energy Ltd. is the SPV via which Amandi Energy Power plant will be developed. Sponsors of the projects are Endeavour Energy with equity interest of 51 per cent, Amandi Founder Group with 24.5 per cent, and Aldwych International with 24.5 per cent. This project is the only large scale base-load independent power generation project in sub-Saharan Africa. It will be initially fueled by light crude oil, but is expected to switch to indigenous gas from Ghana’s offshore Sankofa natural gas field once available. Amandi Energy power plant is a greenfield project developed independently by its sponsors. It will produce more than 1,600 gigawatt hours per year, energizing up to one million Ghanaian households. Amandi Energy will sell power to the Electricity Company of Ghana (ECG) under a 25-year Power Purchase Agreement. The total cost of the project is estimated at $552 million and will be funded by a mix of debt (76 per cent) and sponsors' equity contributions (24 per cent). Amandi Energy Ltd. reached financial close on December, 12 2016. Debt funding is provided by DFIs such as OPIC ($250 million) and CDC Group ($83 million). Ned Bank and Rand Merchant Bank provided a commercial tranche of $85 million, split equally between them. The World Bank’s Multilateral Investment Guarantee Agency did not provide political risk cover for the project, so the commercial lenders instead insured their debt with a group of US-based firms led by Talbot Underwriting and Chubb. OPIC then reinsured the commercial debt. https://ijglobal.com/data/transaction/32741/amandi-gas-fired-power-plant-200mw http://endeavor-energy.com/latest_news/amandi-energy-achieves-financial-close-of-552-million-for-ghanas-amandi-energy-power-plant-and-begins-construction/ http://www.amandi-energy.com/pages/power_plant_overview

Original sector

Energy

Budget

Location

Country

Ghana

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Natural Gas, Oil and Gas, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project