logo

Amata B. Grimm Power 1 Limited

Sector: Natural Gas • Location: Thailand

Source: World Bank Group

Project
Active

The 170-MW, US$140.0 million Amata-EGCO Natural Gas-Fired Power Plant was being developed by the partially divested Electricity Generating Co. (EGCO) (30%) and Amata Power (70%). Amata Power was comprised of. Borneo Co (51%) and Bang Pakong Industrial Park II (49%). As of mid-2000, Amata Power Limited was owned by Energie Baden-Wuerttemburg (30%), B. Grimm Bayernwerk Electrowatt Ltd. (51.2%), Bang

Status
Prospective
Sector
Natural Gas, Car parking, Manufacturing (Industrial), Power Generation (CCGT), Automotive, Commercial, Government
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Amata B. Grimm Power 1 Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Amata B. Grimm Power 1 Limited” is an infrastructure initiative in the Natural Gas sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 170-MW, US$140.0 million Amata-EGCO Natural Gas-Fired Power Plant was being developed by the partially divested Electricity Generating Co. (EGCO) (30%) and Amata Power (70%). Amata Power was comprised of. Borneo Co (51%) and Bang Pakong Industrial Park II (49%). As of mid-2000, Amata Power Limited was owned by Energie Baden-Wuerttemburg (30%), B. Grimm Bayernwerk Electrowatt Ltd. (51.2%), Bang Pakong Industrial Park 2 Public Co., Ltd. (13.77%), and B. Grimm Joint Venture Holding Limited (5.03%). The Amata-EGGO plant was to use gas and combined-cycle technology. A 21-year PPA was signed with the Electricity Generating Authority of Thailand (EGAT) on October 8, 1996 to purchase 90-MW of the plant's energy produced through, which came into effect once the project become operational on September 17, 1998. Remaining energy was to be used by the tenants of the Bang Pakong Industrial Park II. The plant was being developed under the Small Power Producer (SPP) Program that encouraged the sale of excess output to EGAT. Through its CMESCO subsidiary, CMS Generation was to maintain and operate the plant. Siemens AG was the project contractor and equipment supplier. The project is expected to have a 25:75 debt/equity ratio. The project has obtained US$100.0 million in funding from the German Kfw and Bht 900 (aprox. US$34.8 million at January 1997 exchange rates) from Bangkok Bank. The plant's capacity could be increased to 320-MW pending EGAT approval.

Original sector

Energy

Budget

Location

Country

Thailand

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Natural Gas, Car parking, Manufacturing (Industrial), Power Generation (CCGT), Automotive, Commercial, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project