logo

Amata B. Grimm Power 1 Limited

Sector: Natural Gas • Location: Thailand

Source: World Bank Group

Project
Active

The 170-MW, US$140.0 million Amata-EGCO Natural Gas-Fired Power Plant was being developed by the partially divested Electricity Generating Co. (EGCO) (30%) and Amata Power (70%). Amata Power was comprised of. Borneo Co (51%) and Bang Pakong Industrial Park II (49%). As of mid-2000, Amata Power Limited was owned by Energie Baden-Wuerttemburg (30%), B. Grimm Bayernwerk Electrowatt Ltd. (51.2%), Bang

Project Information FAQ

Project Information

4 Q
The project “Amata B. Grimm Power 1 Limited” is an infrastructure initiative in the Natural Gas sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 170-MW, US$140.0 million Amata-EGCO Natural Gas-Fired Power Plant was being developed by the partially divested Electricity Generating Co. (EGCO) (30%) and Amata Power (70%). Amata Power was comprised of. Borneo Co (51%) and Bang Pakong Industrial Park II (49%). As of mid-2000, Amata Power Limited was owned by Energie Baden-Wuerttemburg (30%), B. Grimm Bayernwerk Electrowatt Ltd. (51.2%), Bang Pakong Industrial Park 2 Public Co., Ltd. (13.77%), and B. Grimm Joint Venture Holding Limited (5.03%). The Amata-EGGO plant was to use gas and combined-cycle technology. A 21-year PPA was signed with the Electricity Generating Authority of Thailand (EGAT) on October 8, 1996 to purchase 90-MW of the plant's energy produced through, which came into effect once the project become operational on September 17, 1998. Remaining energy was to be used by the tenants of the Bang Pakong Industrial Park II. The plant was being developed under the Small Power Producer (SPP) Program that encouraged the sale of excess output to EGAT. Through its CMESCO subsidiary, CMS Generation was to maintain and operate the plant. Siemens AG was the project contractor and equipment supplier. The project is expected to have a 25:75 debt/equity ratio. The project has obtained US$100.0 million in funding from the German Kfw and Bht 900 (aprox. US$34.8 million at January 1997 exchange rates) from Bangkok Bank. The plant's capacity could be increased to 320-MW pending EGAT approval.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data