Amata Power Bien Hoa was awarded a 26-year license to build, own, operate, and transfer a 120 MW power plant. Power from the plant will be sold to Electricity of Vietnam and several industrial consumers. The project is divided into two phases: the first phase with capacity of 20 MW consists of three 6.4 MW diesel-fired units (the first 6.4 MW unit, which was under construction in mid-1997 and comm

Project Information FAQ

Project Information

4 Q
The project “Amata Power Bien Hoa Ltd.” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Amata Power Bien Hoa was awarded a 26-year license to build, own, operate, and transfer a 120 MW power plant. Power from the plant will be sold to Electricity of Vietnam and several industrial consumers. The project is divided into two phases: the first phase with capacity of 20 MW consists of three 6.4 MW diesel-fired units (the first 6.4 MW unit, which was under construction in mid-1997 and commenced operations in Aug. 1999, while the other two were expected to complete construction in 2001); the second phase comprises the construction of a combined-cycle facility with capacity of 100 MW. In 2000, Banpu acquired 55% of the registered capital in Amata Power from Electrowatt (30%) and from Amata Power (25%) for approximately US$ 2.29 million (the investment was financed with proceeds from a Nov. 1999 bond issuance by Banpu). The first phase of the project (20-MW power plant) involved an investment of US$ 110 million, financed with loans and equity. The second phase of the project (100-MW combined-cycle plant) will be constructed in the future depending on the electricity demand. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data