logo
ProjectPlanned

Amazon AI Data Centers Reclaimed Water Cooling System

Planned · Mississippi · Last reported Apr 2026

Source: AOL

Amazon and Veolia plan a reclaimed water system for cooling Amazon data centers in Mississippi. The system will treat wastewater from nearby treatment plants and reuse it to cool the data centers, reducing pressure on local drinking water supplies. The system is expected to begin operating in 2027 and will be the first reclaimed-water cooling setup used by Amazon in Mississippi. It is expected to

Status
Prospective
Sector
Water Supply and Storage, Government, Data Center
Location
Ridgeland, Mississippi, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Amazon AI Data Centers Reclaimed Water Cooling System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Amazon AI Data Centers Reclaimed Water Cooling System” is an infrastructure initiative in the Water Supply and Storage sector, located in Ridgeland, Mississippi, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Amazon and Veolia plan a reclaimed water system for cooling Amazon data centers in Mississippi. The system will treat wastewater from nearby treatment plants and reuse it to cool the data centers, reducing pressure on local drinking water supplies. The system is expected to begin operating in 2027 and will be the first reclaimed-water cooling setup used by Amazon in Mississippi. It is expected to reuse more than 83 million gallons of water annually, which would otherwise be supplied by municipal systems, the Big Black River, or pumped from aquifers. The system uses modular, containerized treatment units that can be scaled or replicated at other sites depending on local water availability and regulatory approval.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Ridgeland

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Data Center

Article published date

2026-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project