Amazon-Cumulus Data Center Campus Expansion Master Report
Sector: Commercial • Location: Berwick, Pennsylvania, United States of America
Source: Dodge USA
Amazon to add 15 datacenters to atomic-powered campus - A 48MW, 300K SF facility sits on this site. Expansion to a 960 MW campus is proposed at the Susquehanna power plant on a 1,200-Acre Data Hub at Nuke Plant. The Cumulus data center campus in Berwick, PA is directly connected to 2.5-gigawatt Susquehanna Steam Electric Station.
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Manufacturing (Industrial), Data Center
- Location
- Berwick, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Amazon-Cumulus Data Center Campus Expansion Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Amazon to add 15 datacenters to atomic-powered campus - A 48MW, 300K SF facility sits on this site. Expansion to a 960 MW campus is proposed at the Susquehanna power plant on a 1,200-Acre Data Hub at Nuke Plant. The Cumulus data center campus in Berwick, PA is directly connected to 2.5-gigawatt Susquehanna Steam Electric Station. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Berwick |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Manufacturing (Industrial), Data Center |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
