Amazon Data Center, Ambernath

The owner, status and timeline of this project. A free account opens every field.

Source: Biltrax Media

Amazon Data Services India Private Limited is developing a large-scale data center campus at Asode and Burdul villages in Ambernath, Thane. The project spans approximately 48.85 acres with a total construction area of about 4,240,313 SqFt. It includes four data center buildings (Ground Floor + 7 Upper Floors), an Auxiliary Water Building, a 220 kV GIS Building, pump room, OWC room, and STP room. T

Status
Prospective
Sector
Water Supply and Storage, Data Center, Power Generation (CCGT), Commercial
Location
Ambernath, Maharashtra, India
Updated
19 Nov 2026
Source
Biltrax Media

ConstructChat

Ask ConstructChat about Amazon Data Center, Ambernath

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Amazon Data Center, Ambernath” is an infrastructure initiative in the Water Supply and Storage sector, located in Ambernath, Maharashtra, India. Taiyo aggregates data on it from Biltrax Media.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Amazon Data Services India Private Limited is developing a large-scale data center campus at Asode and Burdul villages in Ambernath, Thane. The project spans approximately 48.85 acres with a total construction area of about 4,240,313 SqFt. It includes four data center buildings (Ground Floor + 7 Upper Floors), an Auxiliary Water Building, a 220 kV GIS Building, pump room, OWC room, and STP room. The campus will have an IT power capacity of 473 MW. The project land was acquired from Macrotech Developers (Lodha Group). Lodha is currently undertaking the design work in-house and acting as the design consultant, with Ramboll India Private Limited providing technical due diligence and geotechnical investigation. Construction is planned from 2026 to 2029 with an estimated cost of 3,500 crore INR.

Original sector

Private

Budget

Location

Country

India

State

Maharashtra

City

Ambernath

Source

Source

Biltrax Media

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Power Generation (CCGT), Commercial

Article published date

2026-08-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project