Amazon SAT3 Warehouse Upgrades
Sector: Manufacturing (Industrial) • Location: San Antonio, Texas, United States of America
Source: Dodge
Update 17 manual workstations with robot arm workstations and add associated charging and maintenance area along with compressed air and vacuum piping loops, remediate floor finish where required. Square Footage: 150,000
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Warehouse, Commercial
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Amazon SAT3 Warehouse Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Update 17 manual workstations with robot arm workstations and add associated charging and maintenance area along with compressed air and vacuum piping loops, remediate floor finish where required. Square Footage: 150,000 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Warehouse, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
