logo
ProjectPlanning Schematics

Amazon Solar Project

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

90 megawatt solar farm along the Clermont-Wilcox Road in Sergeant Township in McKean County, Construction of a substation 2. Construction of a site office 3. Installation of inverters

Status
Prospective
Sector
Raw Materials, Road, Solar, Commercial, Residential, Power Generation (CCGT), Forest Products and Packaging
Location
Wilcox, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Amazon Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Amazon Solar Project” is an infrastructure initiative in the Raw Materials sector, located in Wilcox, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

90 megawatt solar farm along the Clermont-Wilcox Road in Sergeant Township in McKean County, Construction of a substation 2. Construction of a site office 3. Installation of inverters

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Wilcox

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Raw Materials, Road, Solar, Commercial, Residential, Power Generation (CCGT), Forest Products and Packaging

Article published date

2024-09-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project