In 2003, the Brazilian power regulator Aneel awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Mato Grasso state to the Amazonia-Eletronorte consortium. The project company was to transmit power through the concessional period of 30 years. The 193 km line was expected to connect the Coxipo, Cuiaba, and Rondonopolis stations in the Mato Grasso state. The proj

Project Information FAQ

Project Information

4 Q
The project “Amazonia-Eletronorte” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2003, the Brazilian power regulator Aneel awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Mato Grasso state to the Amazonia-Eletronorte consortium. The project company was to transmit power through the concessional period of 30 years. The 193 km line was expected to connect the Coxipo, Cuiaba, and Rondonopolis stations in the Mato Grasso state. The project, signed by the concessional agreement in May 2004, was one of seven transmission concessions awarded by Aneel in 2003-2004. All lines cover 1,787 km and will include investments of US$614 million. Aneel was prompted to release the bids after Brazil’s National Privatization Council (CND) issued a resolution in June 2003 calling for seven groups of transmission concessions. Amazonia-Eletronorte Transmissora e Energia SA originally was joint venture of state-owned Electronorte (49%) and the Amazonia consortium (51%). After some changes in ownership of the Amazonia consortium (including Mastec Brasil selling its stake), it was comprised of Engenharia Comercio e Industria (11.76 percent), Linear Participacoes e Incorporacoes (8.65 percent), Bimetal Industria (19.83 percent), and Alubar Cabos SA (10.76 percent). The consortium was selected on the basis of offering the lowest transmission tariff. The project cost was estimated at US$37.8 million ($111 million real). Project financing was provided by the Banco Nacional de Desenvolvimento Economico e Social (BNDES) for US$24.9 million and by the sponsors (US$12.9 million). Construction began in August 2005 and the project was expected to start operations in mid 2006, allowing for a 13 month construction period. By August 2006, operations had commenced. Mastec Brazil sold 25% stake; Centrais Elétricas do Norte do Brasil (Eletronorte): 49% • Linear Participações e Incorporações Ltda: 8,65% • Bimetal Indústria e Comércio de Produtos Metalúrgicos Ltda: 19,83% • Encomind Engenharia Comércio e Indústria Ltda: 11,76% • Alubar Cabos S.A.:10,76%

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data