logo

Ambuklao-Binga

Sector: Water Supply and Storage • Location: Philippines

Source: International Finance Corporation (IFC)

Project
Completed

_x000C_The Ambuklao and Binga hydroelectric power plants are being privatized as a package through an international tender process, as part of the privatization program under a comprehensive sector reform law, the Electric Power Industry Reform Act (EPIRA). At privatization, expected to occur in June 2008, the plants will be owned by SN Aboitiz Power Benguet, Inc. (SNAPB), a joint-venture between

Project Information FAQ

Project Information

4 Q
The project “Ambuklao-Binga” is an infrastructure initiative in the Water Supply and Storage sector, located in Philippines. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

_x000C_The Ambuklao and Binga hydroelectric power plants are being privatized as a package through an international tender process, as part of the privatization program under a comprehensive sector reform law, the Electric Power Industry Reform Act (EPIRA). At privatization, expected to occur in June 2008, the plants will be owned by SN Aboitiz Power Benguet, Inc. (SNAPB), a joint-venture between SN Power Invest (SN Power) of Norway and Aboitiz Equity Venture (AEV) of the Philippines. IFC’s proposed investment, a loan, will be in parallel with additional financing from Nordic Investment Bank (NIB) and local banks and will support the privatization.The proposed IFC investment will partly finance the privatization and rehabilitation of the 75 MW Ambuklao hydroelectric power plant and the 100 MW Binga hydroelectric power plant, currently owned by National Power Corporation (NPC). The rehabilitation will re-commission the Ambuklao plant, which has been shut down due to silt problems, upgrade the Binga plant, and increase the combined capacity by 50 MW in total (30 MW for Ambuklao and 20 MW for Binga) from 175 MW to 225 MW. They will operate as peaking plants, supplying power to the Luzon grid for about five hours daily. There are no electric transmission system constraints with regard to the expected higher generation levels.The project company, SNAPB, is expected to take over the hydropower facilities in June 2008, and will put in place new management procedures, address technical issues such as sedimentation and dam safety and implement the rehabilitation of both plants. SNAPB will also enter into a separate agreement with the Government, for those facilities that will remain under public ownership, to cover the operation and maintenance of the dams and appurtenant structures, formulation of operations manuals, formation of an oversight committee, and maintaining the integrity of the water levels in the reservoirs. Responsibility for the watershed management will remain with the Government.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data