AMEA Power Solar and Battery Storage Project
The owner, status and timeline of this project. A free account opens every field.
Source: Launch Base Africa
A 300 MWh battery energy storage system integrated with a 500 MW solar plant in Aswan, marking Egypt’s first operational utility-scale storage project, commissioned in July 2025.
- Status
- Closed
- Sector
- Power Transmission, Solar, Energy Storage, Power Generation (CCGT)
- Location
- Aswan, Egypt
- Updated
- 22 Jul 2026
- Source
- Launch Base Africa
ConstructChat
Ask ConstructChat about AMEA Power Solar and Battery Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 300 MWh battery energy storage system integrated with a 500 MW solar plant in Aswan, marking Egypt’s first operational utility-scale storage project, commissioned in July 2025. |
Original sector | Energy |
Location
Country | Egypt |
City | Aswan |
Source
Source | Launch Base Africa |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Solar, Energy Storage, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
