logo
ProjectNotice To Proceed

Amelia Coal Mine

One of 6,542 projects Taiyo tracks in Madhya Pradesh.

Source: India Investment Grid (IIG)

Information THDC India Limited has come up with Amelia Coal Mine with a ticket size of 1587.16 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project ? Amelia Coal Mine located in District Singraulli of Madhya Pradesh was allotted to THDCIL in January 2017 to me

Status
Closed
Sector
Mass Transit, Rail, Road, Government, Power Generation (CCGT), Nuclear, Geothermal, Wind
Location
Singrauli, Madhya Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Amelia Coal Mine

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Amelia Coal Mine” is an infrastructure initiative in the Mass Transit sector, located in Singrauli, Madhya Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

notice to proceed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information THDC India Limited has come up with Amelia Coal Mine with a ticket size of 1587.16 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project ? Amelia Coal Mine located in District Singraulli of Madhya Pradesh was allotted to THDCIL in January 2017 to meet fuel requirement of 1320 MW Khurja STPP. ? CCEA accorded Investment approval for Amelia Coal Mine at an estimated cost of Rs. 1,587.16 Cr. [Dec-17 PL] on 07.03.19. ? Net Geological Reserve in Amelia Coal Mine is 162.05 Million Ton [OC] out of this Extractable Coal Reserve is 139.48 Million Ton. ? Total Peak Rated Capacity [PRC] of Amelia Coal Mine is 5.6 MTPA to meet out the fuel requirement of 2x660 MW Khurja STPP. ? Quality of Coal [Gross Calorific Value] - Average GCV Seam-VIII - 3785.90 K.Cal/Kg & Seam-VII - 4766.50 K.Cal/Kg. ? Amelia OCP is proposed to be worked by shovel-dumper combination for OB removal and coal is proposed to be extracted by Surface Miners by windrowing method and transported by 60T rear dumpers to reclaim feeder for onward transportation to Railway siding through series of surface conveyor belts. ? All necessary clearances FC, EC, Mining Lease, CTE, Mine Opening permission etc. accorded except CTO. ? Mine opened on 17.11.2022. Coal extraction to start from Feb-23. 40 percentage expenditure in Coal evacuation corridor to be made subsequently.

Original sector

Coal

Procurement method

Budget

Location

Country

India

State

Madhya Pradesh

City

Singrauli

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Road, Government, Power Generation (CCGT), Nuclear, Geothermal, Wind

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project