Amelia Coal Mine
One of 6,542 projects Taiyo tracks in Madhya Pradesh.
Source: India Investment Grid (IIG)
Information THDC India Limited has come up with Amelia Coal Mine with a ticket size of 1587.16 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project ? Amelia Coal Mine located in District Singraulli of Madhya Pradesh was allotted to THDCIL in January 2017 to me
- Status
- Closed
- Sector
- Mass Transit, Rail, Road, Government, Power Generation (CCGT), Nuclear, Geothermal, Wind
- Location
- Singrauli, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Amelia Coal Mine
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | notice to proceed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information THDC India Limited has come up with Amelia Coal Mine with a ticket size of 1587.16 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project ? Amelia Coal Mine located in District Singraulli of Madhya Pradesh was allotted to THDCIL in January 2017 to meet fuel requirement of 1320 MW Khurja STPP. ? CCEA accorded Investment approval for Amelia Coal Mine at an estimated cost of Rs. 1,587.16 Cr. [Dec-17 PL] on 07.03.19. ? Net Geological Reserve in Amelia Coal Mine is 162.05 Million Ton [OC] out of this Extractable Coal Reserve is 139.48 Million Ton. ? Total Peak Rated Capacity [PRC] of Amelia Coal Mine is 5.6 MTPA to meet out the fuel requirement of 2x660 MW Khurja STPP. ? Quality of Coal [Gross Calorific Value] - Average GCV Seam-VIII - 3785.90 K.Cal/Kg & Seam-VII - 4766.50 K.Cal/Kg. ? Amelia OCP is proposed to be worked by shovel-dumper combination for OB removal and coal is proposed to be extracted by Surface Miners by windrowing method and transported by 60T rear dumpers to reclaim feeder for onward transportation to Railway siding through series of surface conveyor belts. ? All necessary clearances FC, EC, Mining Lease, CTE, Mine Opening permission etc. accorded except CTO. ? Mine opened on 17.11.2022. Coal extraction to start from Feb-23. 40 percentage expenditure in Coal evacuation corridor to be made subsequently. |
Original sector | Coal |
Procurement method | |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Singrauli |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Road, Government, Power Generation (CCGT), Nuclear, Geothermal, Wind |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
