logo

Amelia Coal Mine

Sector: Mass Transit • Location: Singrauli, Madhya Pradesh, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Information THDC India Limited has come up with Amelia Coal Mine with a ticket size of 1587.16 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project ? Amelia Coal Mine located in District Singraulli of Madhya Pradesh was allotted to THDCIL in January 2017 to me

Project Information FAQ

Project Information

5 Q
The project “Amelia Coal Mine” is an infrastructure initiative in the Mass Transit sector, located in Singrauli, Madhya Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information THDC India Limited has come up with Amelia Coal Mine with a ticket size of 1587.16 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project ? Amelia Coal Mine located in District Singraulli of Madhya Pradesh was allotted to THDCIL in January 2017 to meet fuel requirement of 1320 MW Khurja STPP. ? CCEA accorded Investment approval for Amelia Coal Mine at an estimated cost of Rs. 1,587.16 Cr. [Dec-17 PL] on 07.03.19. ? Net Geological Reserve in Amelia Coal Mine is 162.05 Million Ton [OC] out of this Extractable Coal Reserve is 139.48 Million Ton. ? Total Peak Rated Capacity [PRC] of Amelia Coal Mine is 5.6 MTPA to meet out the fuel requirement of 2x660 MW Khurja STPP. ? Quality of Coal [Gross Calorific Value] - Average GCV Seam-VIII - 3785.90 K.Cal/Kg & Seam-VII - 4766.50 K.Cal/Kg. ? Amelia OCP is proposed to be worked by shovel-dumper combination for OB removal and coal is proposed to be extracted by Surface Miners by windrowing method and transported by 60T rear dumpers to reclaim feeder for onward transportation to Railway siding through series of surface conveyor belts. ? All necessary clearances FC, EC, Mining Lease, CTE, Mine Opening permission etc. accorded except CTO. ? Mine opened on 17.11.2022. Coal extraction to start from Feb-23. 40 percentage expenditure in Coal evacuation corridor to be made subsequently.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data