logo
ProjectPlanned

Ameren Basic Generation Service Rate Increase

The owner, status and timeline of this project. A free account opens every field.

Source: AOL

Ameren announced a temporary rate increase for customers on its Basic Generation Service from 8.7 cents per kilowatt-hour to 11.326 cents starting June 1, 2026. This 29% increase is due to a shortage of electricity supply to meet demand, exacerbated by the proliferation of data centers in Illinois, which require vast amounts of energy to operate. The energy watchdog group Citizens Utility Board ur

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT)
Location
Peoria, Illinois, United States of America
Updated
19 Nov 2026
Source
AOL

ConstructChat

Ask ConstructChat about Ameren Basic Generation Service Rate Increase

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ameren Basic Generation Service Rate Increase” is an infrastructure initiative in the Power Transmission sector, located in Peoria, Illinois, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Ameren announced a temporary rate increase for customers on its Basic Generation Service from 8.7 cents per kilowatt-hour to 11.326 cents starting June 1, 2026. This 29% increase is due to a shortage of electricity supply to meet demand, exacerbated by the proliferation of data centers in Illinois, which require vast amounts of energy to operate. The energy watchdog group Citizens Utility Board urges state lawmakers to pass the Illinois POWER Act to hold data centers accountable for the increased utility costs they cause.

Original sector

Energy

Location

Country

United States of America (USA)

State

Illinois

City

Peoria

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project