Ames-Two Electric Vehicle Charging Stations Install
Sector: Power Generation (CCGT) • Location: Ames, Iowa, United States of America
Source: Dodge
The City is requesting proposals from a qualified company (CONTRACTOR) to install two Level 2 Electric Vehicle (EV) charging stations and related buried electrical lines and equipment at the site listed above. This includes, but not limited to, all work related to supplying power to the EV charger stations as defined in below and the attached drawings
- Status
- Closed
- Sector
- Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Government, Manufacturing (Industrial), Commercial
- Location
- Ames, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ames-Two Electric Vehicle Charging Stations Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City is requesting proposals from a qualified company (CONTRACTOR) to install two Level 2 Electric Vehicle (EV) charging stations and related buried electrical lines and equipment at the site listed above. This includes, but not limited to, all work related to supplying power to the EV charger stations as defined in below and the attached drawings |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Ames |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Government, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
