AMHS Grace Hall Addition
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
New 3,444sf ground-up addition in Everett for the Archbishop Murphy High School weight room located at the north end of Grace Hall. Scope of work includes but is not limited to: Construction Staking, Sitework & Utilities, Retaining Wall, Asphalt Pavement, Presto Geoblock Pavers, Site Concrete, Bldg. Cast-In-Place Foundation/SOG, Ready Mix, Rebar, Masonry, Structural Steel Labor, Structural Steel M
- Status
- Closed
- Sector
- Power Transmission, Steel, Metal, Cement, Road, Commercial, Education, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Everett, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AMHS Grace Hall Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New 3,444sf ground-up addition in Everett for the Archbishop Murphy High School weight room located at the north end of Grace Hall. Scope of work includes but is not limited to: Construction Staking, Sitework & Utilities, Retaining Wall, Asphalt Pavement, Presto Geoblock Pavers, Site Concrete, Bldg. Cast-In-Place Foundation/SOG, Ready Mix, Rebar, Masonry, Structural Steel Labor, Structural Steel Material, Steel Joist, Steel Decking, Insulation, Metal Roof Panels, Sheet Metal: Gutter & Downspo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Everett |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Steel, Metal, Cement, Road, Commercial, Education, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
