AMKO Recycling Facility Expansion Processing Storage
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
Improvements to the existing facility located at 340 West Valley Boulevard (APN 162-136-06) include incorporating new architectural elements to the building facade to support historic preservation consistent with the Design Manual, new landscaping along Pennsylvania Avenue and Valley Boulevard, and construction of a 10,000-sf storage space, which would facilitate enclosing up to 80 percent of the
- Status
- Prospective
- Sector
- Consumer Products, Commercial, Warehouse, Raw Materials
- Location
- Colton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AMKO Recycling Facility Expansion Processing Storage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Improvements to the existing facility located at 340 West Valley Boulevard (APN 162-136-06) include incorporating new architectural elements to the building facade to support historic preservation consistent with the Design Manual, new landscaping along Pennsylvania Avenue and Valley Boulevard, and construction of a 10,000-sf storage space, which would facilitate enclosing up to 80 percent of the recycling operation containing various materials |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Colton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Warehouse, Raw Materials |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
