logo

Amman East Power Project

Sector: Water Supply and Storage • Location: Jordan

Source: World Bank Group

Project
Active

In March 2007, the Jordan state utility National Electric Power Company (NEPCO) signed a BOO agreement with AES Jordan PSC, a joint venture between AES Oasis (60%) and Mitsui (40%), for the construction and operation of a 370MW gas-fired combined-cycle electric power station at Almanakher. The power to be generated by the plant was to be sold to the state-owned electric utility of Jordan at a pric

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Natural Gas, Commercial, Government
Location
Jordan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Amman East Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Amman East Power Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Jordan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In March 2007, the Jordan state utility National Electric Power Company (NEPCO) signed a BOO agreement with AES Jordan PSC, a joint venture between AES Oasis (60%) and Mitsui (40%), for the construction and operation of a 370MW gas-fired combined-cycle electric power station at Almanakher. The power to be generated by the plant was to be sold to the state-owned electric utility of Jordan at a price garanteed by a 25-year power purchase agreement (PPA). AES Oasis was a subsidiary of AES Corporation, of which 39% was sold to IDB Infrastructure fund (managed by Emerging Markets Partnership from Bahrain E.C.) in 2003 (US$150 million). This 39% was onsold to Qatar Electricity & Water Company (QEWC) in 2012. The award followed a competetive bidding process. In June 2005, 9 companies were qualified to bid for the BOO project: Tractebel, AES Corporation, International Power/Saudi Oger, Malakoff, Mitsui, Siemens, UnitInternational and Xenel/Gama. In October 2005, 4 out of the 9 companies were shortlisted for the final bidding: AES Corporation, Gama/Xenel, Mitsui and Saudi Oger. In March 2006, AES Corporation/Mitsui won the tender by proposing 7% less on tariff than the second team Xenel/Gama. Total project cost was evaluated at US$300 million. Financing was secured in March 2007 and was organized as follow: - US$110 million loan from Japan Bank for International Cooperation - US$70 million loan from Overseas Private Investment Corporation - US$45 million loan from Sumitomo Mitsui Banking Corporation (covered by IBRD Guarantee) - US$45 million equity from AES Corporation (90% covered by MIGA Guarantee) - US$30 million equity from Mitsui & Co. Ltd (90% covered by MIGA Guarantee) The project was expected to be completed by 2009. http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2007/02/23/000020953_20070223102629/Rendered/PDF/370980JO0R20071002811.pdf

Original sector

Energy

Budget

Location

Country

Jordan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Natural Gas, Commercial, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project