Amman Solid Waste-to-Energy facility project
Sector: Water Supply and Storage • Location: Jordan
Source: InfraPPPWorld
GAM has two sites available for development of the Project, the Al Ghabawi Landfill site and the Al Shaer Transfer Station site. The new facility will have an initial capacity of 1,200 to 1,500 tons per day (TPD) with at least two fully redundant processing lines.The project will includes the design, build, finance, maintain, operate and transfer and will be developed on DBOT basis.
- Status
- Closed
- Sector
- Water Supply and Storage, Biomass, Waste Processing and Treatment
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Amman Solid Waste-to-Energy facility project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GAM has two sites available for development of the Project, the Al Ghabawi Landfill site and the Al Shaer Transfer Station site. The new facility will have an initial capacity of 1,200 to 1,500 tons per day (TPD) with at least two fully redundant processing lines.The project will includes the design, build, finance, maintain, operate and transfer and will be developed on DBOT basis. |
Original sector | Water & Waste |
Procurement method |
Location
Country | Jordan |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Waste Processing and Treatment |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
