Amman Toll Bridge PPP Project
Sector: Bridge • Location: Amman, Jordan
Source: InfraPPPWorld
The project involves the design, construction, financing, operation, and maintenance of the Amman Bridge that connects Sweileh to the north with Naour to the south along King Abdullah II Road in Jordan.The project consists of the development of a toll bridge along King Abdullah II Road, to allow uninterrupted traffic flow, with toll charges, for private vehicles and Bus Rapid Transit (BRT) buses,
- Status
- Under Construction
- Sector
- Bridge, Road, Commercial, Automotive
- Location
- Amman, Jordan
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Amman Toll Bridge PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the design, construction, financing, operation, and maintenance of the Amman Bridge that connects Sweileh to the north with Naour to the south along King Abdullah II Road in Jordan.The project consists of the development of a toll bridge along King Abdullah II Road, to allow uninterrupted traffic flow, with toll charges, for private vehicles and Bus Rapid Transit (BRT) buses, with an approximate length of 16 km and two lanes in each direction, including the associated works. The project will also integrate with Phase II of the BRT project, including the construction of bus stops, pedestrian bridges, and acceleration, deceleration, and storage lanes for buses, as well as the supply and operation of a fully electronic Free-Flow Tolling system, in addition to the required works and infrastructure. |
Original sector | Transport |
Location
Country | Jordan |
State | Amman |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial, Automotive |
Article published date | 2026-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
