Ampang Line LRT Power Conductor Rail Replacement
Sector: Power Generation (CCGT) • Location: Malaysia
Source: NST Online
AWC Bhd's subsidiary secured a contract to replace power conductor rails on the Ampang Line LRT. The project duration is 36 months with a 24-month defect liability period.
- Status
- Closed
- Sector
- Power Generation (CCGT), Rail
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- NST Online
ConstructChat
Ask ConstructChat about Ampang Line LRT Power Conductor Rail Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AWC Bhd's subsidiary secured a contract to replace power conductor rails on the Ampang Line LRT. The project duration is 36 months with a 24-month defect liability period. |
Original sector | Transportation |
Budget |
Location
Country | Malaysia |
Source
Source | NST Online |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Rail |
Article published date | 2025-12-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
