Amphitheater Ground-up Construction REBID
Sector: Water Supply and Storage • Location: Morrow, Georgia, United States of America
Source: Dodge
This is a ground-up construction of an open-air amphitheater stage and attached green rooms. There is a geotechnical report attached to this bid that shows the correct location of the build This is an established location that has access to power, sewage, and water. The location of the build is in an existing Entertainment District locat
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Stadium, Waste Processing and Treatment, Residential, Government, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Morrow, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Amphitheater Ground-up Construction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a ground-up construction of an open-air amphitheater stage and attached green rooms. There is a geotechnical report attached to this bid that shows the correct location of the build **Civil Plans are being produced for the actual build site** This is an established location that has access to power, sewage, and water. The location of the build is in an existing Entertainment District located off of I-75 Exit 233 behind Southlake Mall. The sound system bid has already been awarded and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Morrow |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Stadium, Waste Processing and Treatment, Residential, Government, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
