logo

Amphitheater Ground-up Construction

Sector: Stadium • Location: Morrow, Georgia, United States of America

Source: Dodge USA

Project
Gc Bidding

This is a ground-up construction of an open-air amphitheater stage and attached green rooms. There is a geotechnical report attached to this bid that shows the correct location of the build This is an established location that has access to power, sewage, and water. The location of the build is in an existing Entertainment District locat

Status
Under Construction
Sector
Stadium, Water Supply and Storage, Waste Processing and Treatment, Residential, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Morrow, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Amphitheater Ground-up Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Amphitheater Ground-up Construction” is an infrastructure initiative in the Stadium sector, located in Morrow, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This is a ground-up construction of an open-air amphitheater stage and attached green rooms. There is a geotechnical report attached to this bid that shows the correct location of the build **Civil Plans are being produced for the actual build site** This is an established location that has access to power, sewage, and water. The location of the build is in an existing Entertainment District located off of I-75 Exit 233 behind Southlake Mall. The sound system bid has already been awarded and ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Morrow

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Stadium, Water Supply and Storage, Waste Processing and Treatment, Residential, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project