Anacostia 2nd High Residential Pressure Reducing Valve Installation Project
Sector: Water Supply and Storage • Location: Washington
Source: District of Columbia Water and Sewer Authority (DC Water)
DC Water has initiated the Anacostia 2nd High Residential Pressure Reducing Valve Installation Project to address long-standing issues and community concerns regarding low water pressure in Ward 8. The project aims to increase water pressure and flow in the specified areas by installing pressure reducing valves (PRV) in eligible residential properties.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | DC Water has initiated the Anacostia 2nd High Residential Pressure Reducing Valve Installation Project to address long-standing issues and community concerns regarding low water pressure in Ward 8. The project aims to increase water pressure and flow in the specified areas by installing pressure reducing valves (PRV) in eligible residential properties. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
