Anacostia River Tunnel Project
Sector: Stadium • Location: Washington
Source: District of Columbia Water and Sewer Authority (DC Water)
The Anacostia River Tunnel Project is the second in a series of four tunnels that mitigates combined sewer overflows that are currently discharged to the Anacostia River. The 23-foot diameter tunnel is approximately 12,500 feet in length and extends from Robert F. Kennedy (RFK) Stadium in northeast DC to Poplar Point in southeast DC.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Anacostia River Tunnel Project is the second in a series of four tunnels that mitigates combined sewer overflows that are currently discharged to the Anacostia River. The 23-foot diameter tunnel is approximately 12,500 feet in length and extends from Robert F. Kennedy (RFK) Stadium in northeast DC to Poplar Point in southeast DC. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
