Anacostia River Tunnel
Sector: Tunnel • Location: Washington, District of Columbia, United States
Source: We Build Value
The Anacostia River Tunnel in Washington, D.C., built by Webuild as part of DC Water's Clean Rivers project, is a 3.8 km tunnel excavated up to 30 meters underground. It captures stormwater and wastewater during heavy rainfall to protect the Anacostia and Potomac rivers from pollution and reduce flooding risk in the city. It features six vertical shafts and advanced hydraulic control systems.
- Status
- Closed
- Sector
- Tunnel, Water Supply and Storage
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- We Build Value
ConstructChat
Ask ConstructChat about Anacostia River Tunnel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Anacostia River Tunnel in Washington, D.C., built by Webuild as part of DC Water's Clean Rivers project, is a 3.8 km tunnel excavated up to 30 meters underground. It captures stormwater and wastewater during heavy rainfall to protect the Anacostia and Potomac rivers from pollution and reduce flooding risk in the city. It features six vertical shafts and advanced hydraulic control systems. |
Original sector | Water |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | We Build Value |
URL |
More Details
Record type | Project |
Sector | Tunnel, Water Supply and Storage |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
