Anaerobic Digester No. 03 Roof Coating Replacement
Sector: Water Supply and Storage • Location: Washington, District of Columbia, United States of America
Source: Dodge USA
The replacement project will consist of three phases which will be applicable to Digester No.3 for the initial project. Under Phase 1 the existing insulation and coatings shall be removed from the steel dome. This work shall be completed while the Digester remains in service which will require completing the work in spark free conditions. The removal shall utilize either scraping with non-sparking
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Steel, Power Generation (CCGT), Metal
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Anaerobic Digester No. 03 Roof Coating Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The replacement project will consist of three phases which will be applicable to Digester No.3 for the initial project. Under Phase 1 the existing insulation and coatings shall be removed from the steel dome. This work shall be completed while the Digester remains in service which will require completing the work in spark free conditions. The removal shall utilize either scraping with non-sparking tools or highpressure water blast or combination of both, at the Contractor's selection. Once Ph... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Steel, Power Generation (CCGT), Metal |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
