logo

Anakkampoyil-Kalladi-Meppadi Tunnel Road Project

Sector: Forest Products and Packaging • Location: Kozhikode, Kerala, India

Source: The Times of India

Project
Under Construction

The Anakkampoyil-Kalladi-Meppadi tunnel road project involves construction of a tunnel road with environmental safeguards including monitoring of landslide-vulnerable zones and ground vibration. The project has environmental management committees (EMCs) for Kozhikode and Wayanad sides to monitor compliance with environmental clearance conditions, but the Kozhikode EMC has met only once in a year a

Status
Under Construction
Sector
Forest Products and Packaging, Tunnel
Location
Kozhikode, Kerala, India
Updated
22 Jul 2026
Source
The Times of India

ConstructChat

Ask ConstructChat about Anakkampoyil-Kalladi-Meppadi Tunnel Road Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Anakkampoyil-Kalladi-Meppadi Tunnel Road Project” is an infrastructure initiative in the Forest Products and Packaging sector, located in Kozhikode, Kerala, India. Taiyo aggregates data on it from The Times of India.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Anakkampoyil-Kalladi-Meppadi tunnel road project involves construction of a tunnel road with environmental safeguards including monitoring of landslide-vulnerable zones and ground vibration. The project has environmental management committees (EMCs) for Kozhikode and Wayanad sides to monitor compliance with environmental clearance conditions, but the Kozhikode EMC has met only once in a year and has not functioned effectively.

Original sector

Transportation

Location

Country

India

State

Kerala

City

Kozhikode

Source

Source

The Times of India

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Tunnel

Article published date

2026-07-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project