Anamosa WWTP Flow Equalization Basin
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project generally includes furnishing all labor, material, and equipment necessary for construction and installation of prestressed concrete flow equalization basin, precast lift station and valve vault, submersible pumps, prefabricated pump control building, force main, gravity sewer and other miscellaneous items
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment
- Location
- Anamosa, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Anamosa WWTP Flow Equalization Basin
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally includes furnishing all labor, material, and equipment necessary for construction and installation of prestressed concrete flow equalization basin, precast lift station and valve vault, submersible pumps, prefabricated pump control building, force main, gravity sewer and other miscellaneous items |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Anamosa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
