logo

Ananthapuram-II Renewable Energy Zone (Phase-II) Transmission System

One of 9,183 projects Taiyo tracks in Andhra Pradesh.

Source: Mercomindia.com

Project
Planned

REC Power Development and Consultancy invited bids to set up an interstate transmission system to integrate 3 GW of renewable energy at Ananthapuram-II Renewable Energy Zone (Phase-II) in Andhra Pradesh. The work includes augmentation of the Ananthapuram-II pooling station with a 400/220 kV, 1×500 MVA interconnecting transformer, and provision of 220 kV and 400 kV line bays for dedicated transmiss

Status
Prospective
Sector
Power Generation (CCGT), Solar, Road
Location
Ananthapuram, Andhra Pradesh, India
Updated
22 Jul 2026
Source
Mercomindia.com

ConstructChat

Ask ConstructChat about Ananthapuram-II Renewable Energy Zone (Phase-II) Transmission System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ananthapuram-II Renewable Energy Zone (Phase-II) Transmission System” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ananthapuram, Andhra Pradesh, India. Taiyo aggregates data on it from Mercomindia.com.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

REC Power Development and Consultancy invited bids to set up an interstate transmission system to integrate 3 GW of renewable energy at Ananthapuram-II Renewable Energy Zone (Phase-II) in Andhra Pradesh. The work includes augmentation of the Ananthapuram-II pooling station with a 400/220 kV, 1×500 MVA interconnecting transformer, and provision of 220 kV and 400 kV line bays for dedicated transmission lines from renewable energy projects.

Original sector

Energy

Location

Country

India

State

Andhra Pradesh

City

Ananthapuram

Source

Source

Mercomindia.com

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Road

Article published date

2025-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project