Anaquitas Drainage Improvements Phase 2
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
The proposed HCDD 1 Anaquitas Drainage Improvements Project (Phase 2) (Sta. 78+00 to Sta. 114+00), 2018 Bond Project No. 8 consists of Ditch Regrading of an existing drainage channel and Earthwork (excavation and fill) for 2 proposed detention ponds (Det. Pond 3 & 3A) adjacent to a section of the existing drainage channel. Project also consists of Barricade, Signs & Traffic Control set-up for ingr
- Status
- Prospective
- Sector
- Water Supply and Storage, Cable car, Government, Telecommunications, Road, Automotive, Commercial, Raw Materials, Waste Processing and Treatment
- Location
- Edinburg, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Anaquitas Drainage Improvements Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed HCDD 1 Anaquitas Drainage Improvements Project (Phase 2) (Sta. 78+00 to Sta. 114+00), 2018 Bond Project No. 8 consists of Ditch Regrading of an existing drainage channel and Earthwork (excavation and fill) for 2 proposed detention ponds (Det. Pond 3 & 3A) adjacent to a section of the existing drainage channel. Project also consists of Barricade, Signs & Traffic Control set-up for ingress/egress points from existing ditch to existing roadways and Erosion Control along the project ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Edinburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cable car, Government, Telecommunications, Road, Automotive, Commercial, Raw Materials, Waste Processing and Treatment |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
