ANC Gates B5 and B7 Passenger Boarding Bridge Replacements
Sector: Airport • Location: Anchorage, Alaska, United States of America
Source: Dodge
Design and construction services as required to replace two existing passenger boarding bridges (PBBs) located at Gates B5 and B7 in the South Terminal at Ted Stevens Anchorage International Airport. Design build services to remove and replace two existing passenger boarding bridges (PBBs) at Ted Stevens Anchorage International Airport.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Design and construction services as required to replace two existing passenger boarding bridges (PBBs) located at Gates B5 and B7 in the South Terminal at Ted Stevens Anchorage International Airport. Design build services to remove and replace two existing passenger boarding bridges (PBBs) at Ted Stevens Anchorage International Airport. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
