Anchieta - Imigrantes Toll Road
Sector: Government • Location: Brazil
Source: World Bank Group
The government of São Paulo reached an agreement with the concessionaire Ecorodovias to extend the concession contract for the Anchieta-Imigrantes System until March 2033. Currently, this agreement had an end date in March 2024.
The new contract will result in investment of 1.1bn reais (US$202mn) in the Anchieta-Imigrantes highway system. As part of the deal, Ecorodovias will pay an additional fe
- Status
- Prospective
- Sector
- Government, Seaport, Road, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Anchieta - Imigrantes Toll Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The government of São Paulo reached an agreement with the concessionaire Ecorodovias to extend the concession contract for the Anchieta-Imigrantes System until March 2033. Currently, this agreement had an end date in March 2024. The new contract will result in investment of 1.1bn reais (US$202mn) in the Anchieta-Imigrantes highway system. As part of the deal, Ecorodovias will pay an additional fee to the state government of 613mn reais (US$113mn). Contract was signed in May 2021. The 177km route connects São Paulo city to coastal areas, including Latin America's busiest port, Santos. https://global.factiva.com/redir/default.aspx?P=sa&an=WBNA000020210504eh530000r&cat=a&ep=ASE |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Seaport, Road, Manufacturing (Industrial) |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
- ERB Candeias Thermal Power Plant
- Sol do Futuro Solar PV Plant
