logo
ProjectClosed

ANCJOCAYA-HYDROELECT

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

The Anchicaya Hydroelectric Project for Colombia will provide a loan to the Central Hidroelectrica del Rio Anchicaya (CHIDRAL) to cover the costs for the construction of the Anchicaya Center power station with an initial capacity of 24,000 kw. CHIDRAL has full rights to the development of the Anchicaya River which is estimated to have a power potential between 350,000 to 400,000 kw. In order to ex

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ANCJOCAYA-HYDROELECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ANCJOCAYA-HYDROELECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Anchicaya Hydroelectric Project for Colombia will provide a loan to the Central Hidroelectrica del Rio Anchicaya (CHIDRAL) to cover the costs for the construction of the Anchicaya Center power station with an initial capacity of 24,000 kw. CHIDRAL has full rights to the development of the Anchicaya River which is estimated to have a power potential between 350,000 to 400,000 kw. In order to exploit the power potential of the river, a new station must be developed. The project will accomplish this goal by: 1) constructing a power station; 2) constructing a gravity type dam with a spillway, reservoir, gravity tunnel, surge tank, and penstock; 3) procuring generating equipment consisting of two 17,100 h.p. Francis type turbines; 4) constructing a powerhouse; 5) purchasing transformer equipment; and 6) installing transmission lines. These new additions will help to expand the power supply system in the Anchicaya River area.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project