logo

ANCJOCAYA-HYDROELECT

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

Project
Closed

The Anchicaya Hydroelectric Project for Colombia will provide a loan to the Central Hidroelectrica del Rio Anchicaya (CHIDRAL) to cover the costs for the construction of the Anchicaya Center power station with an initial capacity of 24,000 kw. CHIDRAL has full rights to the development of the Anchicaya River which is estimated to have a power potential between 350,000 to 400,000 kw. In order to ex

Project Information FAQ

Project Information

5 Q
The project “ANCJOCAYA-HYDROELECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Anchicaya Hydroelectric Project for Colombia will provide a loan to the Central Hidroelectrica del Rio Anchicaya (CHIDRAL) to cover the costs for the construction of the Anchicaya Center power station with an initial capacity of 24,000 kw. CHIDRAL has full rights to the development of the Anchicaya River which is estimated to have a power potential between 350,000 to 400,000 kw. In order to exploit the power potential of the river, a new station must be developed. The project will accomplish this goal by: 1) constructing a power station; 2) constructing a gravity type dam with a spillway, reservoir, gravity tunnel, surge tank, and penstock; 3) procuring generating equipment consisting of two 17,100 h.p. Francis type turbines; 4) constructing a powerhouse; 5) purchasing transformer equipment; and 6) installing transmission lines. These new additions will help to expand the power supply system in the Anchicaya River area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data