Andasol Solar Thermal Power Project
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project will be the first large-scale commercial thermal solar power plant to be developed in Europe. It will incorporate state-of-the-art technology with a sizeable European content. The overall project proposed to the Bank concerns a new concentrating solar thermal power (CSP) generation plant with a capacity of 50 MWe, to be developed in a wide valley north of the Sierra Nevada, some 60 km
- Status
- Under Construction
- Sector
- Solar, Wind, Power Generation (CCGT), Commercial, Geothermal, Government
- Location
- Spain
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Andasol Solar Thermal Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will be the first large-scale commercial thermal solar power plant to be developed in Europe. It will incorporate state-of-the-art technology with a sizeable European content. The overall project proposed to the Bank concerns a new concentrating solar thermal power (CSP) generation plant with a capacity of 50 MWe, to be developed in a wide valley north of the Sierra Nevada, some 60 km south-east of Granada. The project will benefit from Spanish legislation that provides a fixed tariff for solar thermal power generation equivalent to 3 times the reference tariff in Spain, guaranteed for 25 years, which secures the financial viability of the project. |
Original sector | Energy |
Location
Country | Spain |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Power Generation (CCGT), Commercial, Geothermal, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
