Anderson Bridge Replacement Project
Sector: Road • Location: New Brunswick, Canada
Source: Infrastructure Canada
The project will involve the complete removal of the existing Anderson Bridge and the construction of a new bridge 6-span structure which will be 480 metres in length.
- Status
- Closed
- Sector
- Road, Bridge, Commercial
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Anderson Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will involve the complete removal of the existing Anderson Bridge and the construction of a new bridge 6-span structure which will be 480 metres in length. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Commercial |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
